The New Bedroom, Part IV

That looks better…

As I mentioned in the previous post, it took multiple coats to get through this, likely 2/3 of a gallon of paint. I used the roller twice on it, then Brooke came back through with the same off-white color we used in the other bedroom, so it matched. Then she had to come through again with the “Evergreen fog” paint to cover any extra white she’d gotten on the color of the walls. Just a lot of back and forth, really…

Is this the worst part? It may be the worst part…

I took care of the carpet this morning, cutting it roughly into quarters, then pulled up from the edges. The carpet actually came off relatively easily, but it took awhile to “find my groove,” since it’s been awhile since I did this.

The ongoing coronapocalypse is making trash pick-up difficult, so we’ll try to dispose of the carpet as best we can, but for now, it’s rolled up in those quarters on our back porch. Not ideal, but it is what it is. There’s furniture in our garage awaiting some painting, so it’ll be a bit before we can move the carpet out there. Overall, I think we were able to keep most of the dust from our wallpaper scraping on the carpet so it wouldn’t get all over the floor underneath.

The hardwood looks similar to the other bedroom.

Pulling up the tack board around the edges of the room took forever. I’m pretty sure that was Dad’s job the last time we did this, so I don’t think I’d done much of it before. This was another time it took me a bit to “find my groove” and finally feel like I was making progress. Pretty sure it took me an hour and a half to get just that part done. Brooke came up and joined me for pulling up the staples that was holding down the pad under the carpet, and while that was tedious, it went pretty well.

For now, we went ahead and kept the carpet in the kid’s closet. It will get removed, but we’ve got some time for reasons I’ll get to momentarily…

(Mostly) finished product!

After a round of vacuuming, then wood cleaner, then more vacuuming, we were done!

So, this project began on Saturday, March 28, and we finished it up on Saturday, April 11th. Technically, we still aren’t done, as we’re waiting on Meg’s bed frames to get fixed up. The frames are from my Dad’s father and brother, so they’re very old, but also only kinda fit modern beds. One of them is a full-size bed frame, but the other is about 5″ too short in the length, so it won’t fit a frame properly. We’re going to try and get a welder here in town to try and adapt it so we can have two full beds in the room.

We’re also getting a wardrobe for this room, so the closet will be mostly Calvin’s, though maybe we’ll hang a few things of Meg’s in there, too. We’re also going to move a dresser into Meg’s room, so there’s more furniture to go in, but again, it’ll take awhile for the beds to be done, and it’ll take awhile for a wardrobe to arrive.

Soooooooo, in the meantime, we’re moving on to our bedroom. We’re letting Meg sleep on a sleeping bag in her new room for a few nights, and then we’re going to break down and transfer our bed and furniture into Meg’s room while she moves back in with Calvin. Then, it’ll probably be another two weeks until our room is done, but then we’ll be mostly “project complete” for 2020. That will give us a few weeks to get the furniture situation figured out so Meg can be in her own room long-term!

On to the next project!